Roof Tiles → Wooden Batten Strips → Corrugated Asphalt Waterproof Board → Cement Mortar Leveling → Concrete Roof Base
Before installing corrugated asphalt waterproof board, inspect the flatness and strength of the roof base.
Flatness requirement: Level the roof from ridge to eave in a straight line; the error must be within ±5mm when checked with a 2m straightedge.
Eave Area:
Lay 3mm self-adhesive modified asphalt waterproof membrane, extending from eave to ridge not less than 500mm.
Inclined Gutter Area:
Use 3mm self-adhesive modified asphalt waterproof membrane for additional treatment, extending at least 250mm to both sides from gutter center. Fixing nails must be at least 260mm upward from gutter center line to avoid penetrating the membrane.
Lay insulation boards over large areas by mortar spot bonding. On low-slope roofs, insulation boards can be laid directly without additional treatment.
At internal gutters, adjust insulation board thickness to match tile radian. Waterproof board must cover internal gutter tile edge by 2cm toward center line to prevent water backflow.
Start laying from eave to ridge, from bottom to top. Overlap upper and lower boards by 100mm, left and right by one wave. Stagger vertical joints by 1/3 or 1/2 sheet width.
Batten Strips: Use preservative pine battens 20×40mm, uniform thickness, few knots.
Fixing: Use expansion nails to penetrate battens, waterproof board and insulation boards, extending into roof structure at least 40mm. Nails must be fixed at wave crests.
Size: 20×40mm, fixed with expansion nails, 10–12 nails per m².
Battens must be straight, firm, joints staggered. Install double battens at eave.
Construct gutters after main roof tiles installation. Width depends on catchment area and rainfall.
Lay gutter tiles with cement mortar, keep straight and stable.
Walk only on batten strips or use wooden supports on waterproof board.
Avoid stepping on finished tiles. Cut tiles under roof to prevent dust contamination.
Contractor shall install and maintain safety protection at eaves. Protective measures can only be removed after full completion.
All construction personnel must follow safety operation procedures to prevent falling accidents.
Company Name: Shanghai Safebuild Co.,Ltd.
Address: No.300, Xuanhua Rd., Changning,Shanghai, China
Tel: +86-21-51061361
WhatsApp&WeChat: +8615317579015
Email: info@safebuild.cn
Website: www.safebuild.cn